Stormwater

CORE routinely prepares Stormwater Pollution Prevention Plans (SWPPPs) to comply with the requirements of SPDES permits. We also provide the site-inspection services required to conform to the requirements of New York State Department of Environmental Conservation’s (NYSDEC) General Permit for Stormwater Discharges from Construction Activity Permit GP-0-15-002.

NY Power Authority - SENY

The New York Power Authority (NYPA) hired CORE to complete sampling and analysis at the Authority’s Charles Poletti/500 MW Richard M. Flynn Power plant and the Small Clean Power Plants sites (SCPP), located in Astoria, Long Island City, Bronx, Brooklyn, Staten Island, Holtsville, and West Brentwood, NY. CORE provides State Pollution Discharge Elimination System (SPDES), Major Oil Storage Facility (MOSF), and Resource Conservation and Recovery Act (R...

Remmington Woods Apartments

CORE was retained by Zaepfel Property Development & Leasing (Zaepfel) to complete Stormwater Pollution Prevention Plans (SWPPP) and inspections at the Remmington Woods Apartments currently being developed at 1690 Wehrle Drive in Williamsville, New York, along with the PHH Office Building being constructed at 1760 Wehrle Drive in Williamsville. The SWPPP included a pre-construction screening and assessment of exposed materials that may encounter precipitation....

Lime Lake Sewer District Project

CORE was retained by MDA Consulting Engineers, PLLC (MDA) to complete a Stormwater Pollution Prevention Plan (SWPPP) for construction activities associated with a sanitary sewer installation project. The project consisted of four components: Collection system piping to be constructed around Lime Lake primarily by method of horizontal directional drilling and serving the residents in the Lime Lake Sewer District Development of the collection system at each property a...

JetBlue Airways

CORE was retained by JetBlue Airways to complete Stormwater Pollution Prevention Plans (SWPPP) at all JetBlue stations and support facilities (48 locations) in the U.S. CORE streamlined the site assessment process by developing a site inspection form for facility managers to complete and a comprehensive report template. The project included a materials inventory and significant exposed materials inventory, as well as a review of existing SWPPP plans and...