CORE Environmental Consultants is recognized among the top asbestos survey companies serving New York City and Western New York. We provide comprehensive asbestos surveys and abatement design services to support safe renovation, demolition, and facility management.
Our NYSDOL-certified inspectors and abatement designers ensure full compliance with EPA, NYCDEP, and OSHA standards. Whether you’re managing a facility, planning a capital project, or preparing for demolition, CORE delivers a turnkey solution—from asbestos inspection through contractor-ready plans and ACP-5 filing support.
When Are These Services Required?
Both asbestos surveys and abatement designs are legally required in New York when disturbing building materials that may contain asbestos. As a leader among asbestos survey companies, CORE commonly performs services:
- Prior to renovation or demolition of buildings constructed before 1985
- To satisfy DOB/DEP filing requirements, including ACP-5 and ACP-7
- As part of hazardous material surveys for property transfers or compliance
- In support of abatement contractor bid packages
- To assist with environmental remediation and construction phasing
CORE works on projects ranging from single-unit assessments to complex multi-structure investigations, all with the same emphasis on defensibility and compliance.
Our Asbestos Survey Process
1. Pre-Survey Review
We begin with a review of building records, prior surveys (if available), drawings, and the proposed scope of work. This helps determine the appropriate survey classification under NYSDOL Industrial Code Rule 56 (limited, targeted, or comprehensive).
This step ensures fieldwork will align with regulatory filing needs from the start.
2. Visual Inspection
Certified NYSDOL Asbestos Inspectors perform a room-by-room walkthrough, identifying and documenting all suspect ACMs by homogeneous area. Common materials include:
- Pipe and duct insulation
- Floor tile and mastic
- Plaster, joint compound, and wall systems
- Ceiling tiles and spray-applied fireproofing
- Roofing materials, window caulking, and waterproofing
Inspectors log detailed information including location, material condition, friability, and accessibility.
3. Bulk Sample Collection
Representative samples are collected from each suspect material using destructive or non-destructive methods, depending on access and occupancy status. All sampling is performed using PPE and safety protocols, minimizing exposure risks and disruption.
Samples are submitted to NVLAP-accredited laboratories for Polarized Light Microscopy (PLM) analysis in accordance with EPA Method 600/M4-82/020. TEM analysis may be conducted for NOB (non-friable organically bound) materials when PLM results are inconclusive.
4. Documentation & Reporting
All confirmed ACMs are mapped on annotated floor plans and quantified in square or linear footage. Reports include:
- Material types and friability classifications
- Laboratory results with sample IDs and analysis methods
- Photos of sampling locations and affected materials
- Regulatory notes for DOB/DEP filing
- ACP-5 preparation if no ACMs are found in the scope of work
Our Asbestos Abatement Design Services
When ACMs are confirmed and removal is required, CORE provides complete abatement design services, including specifications, plans, and contractor coordination support.
1. Scope of Work Development
We translate survey findings into a clearly defined work scope, identifying:
- ACM types and quantities
- Work area locations and boundaries
- Required controls (containment, isolation, negative pressure)
Design documents are tailored to site conditions, project timelines, and other trade interactions.
2. Technical Specifications
We develop project specifications that define:
- Work procedures for removal or encapsulation
- Engineering controls and air monitoring
- PPE and worker protection requirements
- Waste handling, labeling, and disposal protocols
- Regulatory references and filing requirements
Our documents align with NYSDOL Code Rule 56, OSHA 1926.1101, and applicable city regulations.
3. Drawings & Bid Documents
If needed, we generate work area plans or floor plan overlays to support contractor bidding and DEP filings. These drawings help clarify logistics, sequencing, and access requirements.
We also assist in preparing content for bid packages, helping clients obtain competitive, informed proposals.
4. Contractor & Regulator Coordination
During the design phase, we coordinate with construction teams, site managers, and regulatory representatives as needed to:
- Review abatement designs for feasibility
- Address phasing or schedule concerns
- Incorporate design updates from other trades
- Prepare or review ACP-7 forms for DEP submission
Why CORE is a Trusted Name in Asbestos Survey Companies
✅ Licensed Professionals
All asbestos work is performed by NYSDOL-certified inspectors, project monitors, and abatement designers.
✅ Regulatory Expertise
We align every survey and design with the requirements of NYSDOL, NYCDEP, DOB, and EPA NESHAP, reducing risks of rejection or delays.
✅ End-to-End Support
From survey through clearance, CORE handles the full process—including monitoring, documentation, and coordination.
✅ Bundled Capabilities
Our team can also perform lead paint inspections, mold assessments, PCB sampling, and other services as part of your complete hazardous materials package.
✅ Defensible, Detailed Reporting
We deliver reports that stand up to contractor review, agency filing, and owner documentation audits.