CORE Environmental Consultants offers expert oversight and design support for the installation and upgrade of fuel storage and delivery systems, including tanks, piping, pumps, day tanks, and control systems. Whether installing a new fuel infrastructure or upgrading existing systems to meet NYSDEC, EPA, or fire code regulations, CORE ensures every component is compliant, safe, and operationally efficient.

We serve facility managers, developers, mechanical contractors, and environmental consultants managing diesel generator fuel systems, heating oil storage, or fleet fueling operations across institutional, commercial, and industrial properties.


When Are Fuel System Services Needed?

Fuel system installation or upgrades may be required when:

  • Installing new generators, boilers, or fuel-dependent equipment
  • Replacing aging or leaking tanks, pumps, or piping
  • Converting from underground to aboveground storage
  • Complying with updated PBS, fire code, or SPCC requirements
  • Integrating a new day tank or transfer system
  • Bringing a site into compliance for Brownfield, BCP, or redevelopment projects
  • Performing tank closure followed by a new installation
  • Modernizing systems with automation, alarms, and leak detection

Whether part of new construction or facility retrofitting, our services ensure performance without regulatory delays or operational setbacks.


CORE’s Fuel System Services

We provide full support for:

  • AST/UST tank system installation (UL-142, UL-2085, fire-rated, double-wall)
  • Fuel piping and containment trenching (supply, return, and fill lines)
  • Day tank installation, with float switch control and pump integration
  • Pump and fill station design, including transfer pumps, overfill protection, and emergency shutoffs
  • Venting, leak detection, and alarm system integration
  • Electrical coordination for control systems and emergency power
  • Secondary containment design – slabs, dikes, sumps, and spill boxes
  • SPCC and PBS registration updates
  • As-built documentation and agency closeout support
  • Coordination with NYC Fire Department and NYSDEC for approvals
  • Remedial system fuel integration for dual-use pumping or heating

We coordinate closely with contractors and vendors to streamline execution and minimize change orders or inspection delays.


Construction & Oversight Process

  1. Pre-Installation Review
    CORE evaluates site plans, existing infrastructure, and compliance requirements to ensure the system layout is constructible and code-compliant.
  2. Design Coordination
    If CORE completed the AST system design, we provide full continuity. If not, we review third-party plans for constructability, regulatory alignment, and field practicality.
  3. Field Oversight During Installation
    We provide on-site representation during key phases—tank placement, piping installation, containment construction, and final connections—to verify work is done to spec.
  4. Regulatory Coordination and Inspections
    CORE assists with scheduling and documentation for Fire Department, NYSDEC, or third-party inspector reviews.
  5. Post-Construction Testing and Documentation
    We support leak testing, startup, and prepare final documentation, including as-builts, SPCC amendments, and PBS registration updates.

Regulatory & Code Standards We Follow

  • 6 NYCRR Part 613 – Petroleum Bulk Storage
  • 40 CFR 112 – Spill Prevention Control and Countermeasure (SPCC)
  • NFPA 30, 30A, 37, and 110 – Fuel storage and emergency generator codes
  • UL-142 and UL-2085 tank and component standards
  • International Fire Code (IFC) and local fire department permits
  • New York City Construction and Mechanical Codes

CORE ensures installations are compliant from the first trench to the final test.


✅ Why CORE?

✔ Comprehensive Fuel System Knowledge
From engineering to permitting to on-site field verification, we understand the full lifecycle of fuel systems—ensuring alignment from planning through inspection.

✔ Integrated with PBS, SPCC, and Environmental Compliance
We make sure your fuel system isn’t just operational, but legally documented and environmentally protected.

✔ Responsive Project Support
CORE bridges the gap between contractors, engineers, and regulators—helping you avoid miscommunications, work stoppages, or costly changes.

✔ Experience Across Project Types
Whether supporting a 275-gallon diesel day tank for a school or a 20,000-gallon bulk AST system for a utility yard, CORE has the technical capability and project depth to deliver.

Our Petroleum Bulk Storage & Spill Prevention Services.

Petroleum Bulk Storage Compliance

CORE provides full-spectrum compliance support for Petroleum Bulk Storage (PBS) facilities governed by 6 NYCRR Part 613. Our services include PBS registration, tank system audits, spill prevention planning, and regulatory filings—ensuring that AST and UST systems meet all NYSDEC, fire code, and EPA requirements across commercial and institutional sites.

Underground Storage Tank (UST) Closures

CORE oversees UST closures in accordance with NYSDEC and EPA regulations, including regulatory notifications, tank removal, cleaning, soil sampling, and closure documentation. Whether tanks are removed or abandoned in place, our team delivers defensible reporting and rapid coordination to support property transactions, redevelopment, and spill prevention.

Aboveground Storage Tank (AST) System Design

CORE designs Aboveground Storage Tank (AST) systems for heating oil, diesel, and fleet fueling operations. Our engineers prepare code-compliant plans with secondary containment, overfill protection, venting, and slab design—fully aligned with NFPA, PBS, and fire code standards for new construction, tank replacements, or fuel system retrofits.

Fuel System Installation & Upgrades

CORE supports the installation and modernization of fuel systems including tank placement, piping, pumps, leak detection, and control systems. We coordinate permitting, field inspections, and regulatory compliance for generator fueling, vehicle depots, and institutional heating—ensuring safe, fully functional fuel delivery infrastructure.

Spill Prevention, Control, and Countermeasure (SPCC)

CORE prepares SPCC Plans in compliance with EPA 40 CFR Part 112 for facilities storing petroleum products above threshold quantities. Our services include tank inventories, site drainage mapping, secondary containment design, and PE certification—delivering field-ready plans with inspection logs, response procedures, and defensible documentation.

Tank Inspection & Leak Detection Programs

CORE provides routine inspection and leak detection services for AST and UST systems to ensure compliance with PBS and EPA requirements. We conduct monthly, annual, and 5-year checks, assess spill prevention systems, and maintain inspection records—helping clients prevent releases and pass regulatory audits with confidence.

Build It Right. Power It Safely.

CORE delivers fuel system installations and upgrades with precision, permitting support, and long-term compliance in mind.

Close Search Window